Scope of Work
91°µÍø is constructing anew 765kV line using self-supporting, 4 legged lattice towers constructed onconcrete foundations. The line utilizes 6 bundle 795 kcm (45/7) ACSR conductorand two optical ground wires.
Related Projects
115kv Steel Structure Reinforce & Reconductor High Voltage Electric Transmission Line
Transmission Systems
MA, NH
Bingham Wind Power Project
Transmission and Distribution Construction